G Road Bridge Replacement Project

G Road will be closed to traffic starting Wednesday, October 20th between 24 Road and the south entrance to Canyon View Park. The G Road closure will be in effect until the new G Road bridge is completed, which is anticipated to be completed by the end of March 2022 or early April 2022. 

The new G Road bridge location is shifted east approximately 75 feet from the existing G Road bridge. The span of the new bridge is being increased to accommodate a pedestrian underpass pathway. This underpass pathway will connect Canyon View Park with a future trail extension project, located on the south side of G Road. Utility relocations (sewer, water, storm, gas, electric, and communications) are included with this project and are necessary for new bridge construction and the existing bridge demolition. 

This bridge replacement is the first project funded with Ballot Measure 2A Transportation Capacity Expansion Funds. This bridge project is the first component being completed as part of the larger 24 Road and G Road expansion project that will be happening in 2022. 

Road Closures

  • G Road will be closed to traffic starting Wednesday, October 20th between 24 Road and the south entrance to Canyon View Park.

Detour Routes

The detour route utilizes 24 Road, Patterson Road, and 24 1/2 Road for getting around the construction zone.

G Road Closure Exhibit

Alternative Access Points to Canyon View Park

  • Access to Canyon View Park will be from the existing 24 Road entrance and the 24 ½ Road entrance.
  • The diagonal parking along the northside of G Road will be available for park users to park in.

Canyon View Map