Background

The B ½ Road corridor, located east of 27 ½ Road, consists of a two-lane roadway that serves as a major east-west collector within the transportation network for the Orchard Mesa area. This is also a critical corridor due to the access to Lincoln Orchard Mesa Elementary School and Fire Station #4, both located just west of 29 Road. The section of B ½ Road from 29 Road to 29 ¾ Road was prioritized for improvements due to projected growth and the lack of pedestrian facilities near the elementary school, which was included in the voter-approved bond measure for transportation capacity improvements.

Schedule

This project is scheduled to be constructed in 2027. 

Proposed Improvements

This project will widen B ½ Road from 29 Road to 29 ¾ Road to a 3-lane collector road section, including curb, gutter, sidewalk, bike lanes, and streetlights. The project improvements are proposed to increase safety and accommodate the projected traffic volumes for the area.

Aerial map of Orchard Mesa showing proposed improvements along B 1/2 Road

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow